Lake|Flato Architects, pictured above, are with you every step of the design and construction process — a process that allows for a great deal of design flexibility, while insuring a predictable construction outcome in terms of cost, quality, and time.  As with all of our residential projects, we listen to each client's dreams and aspirations, then craft a design and oversee construction through an inclusive and collaborative process.
DESIGN (1-2 months)

conceptual

Understanding how a building interacts with the building site has always been a staple of Lake|Flato's work. The first step is site analysis discussions and initial room configurations based on the owner's requirements.

schematic

After evaluating the site and finalizing programmatic needs, the design process focuses on configuration of modular rooms, material selections, porches, and other outdoor spaces on the site. Design recommendations and a preliminary project budget are presented.

construction documents

Based on design and budget approval, construction documents are finalized for both the factory and on-site construction. Energy models are developed to forecast energy savings features. A dedication to the principles of sustainable design and LEED certification is a primary goal.
CONSTRUCTION (6-9 months)

site and factory

After permits are obtained, site preparation and factory-constructed rooms occur simultaneously. This represents a significant time savings benefit.

room delivery

Upon completion of the factory constructed rooms, they are transported and positioned on site. The rooms are “weather tight” for completion of final interior and exterior finishes.

completion

The final step involves site built elements, installation of roof surfaces, porches and outdoor rooms, utilities, and landscaping.